
Agios Konstantinos LIMITS
22 November 2017
Volunteer Group 7, Drosia Funding
5 February 2018Drosia Friends Volunteer Group 30 January 2018
«Drosias» Tritaia Patras No. Cfi. : 06.
Contact: D. Dimitropoulos
Tel.: 2610-222406 mob.: 6972317548
& 2610-431109 mob.: 6936659740
E-mail: dimdimitropoulos161@gmail.com
& basdimitr@gmail.com
Towards
Municipality of Erymanthos, Mr. Mayor and Vice President. Mr. Souvalioti Ioannis
cc: President of the Local Community "Drosias"
Subject: 1) Installation of a telephone line and installation of railings in the
Community Clinic of our village.
2) Installation – Construction of railings outside the entrance of the church of Ag.
Athanasiou of our village.
Mr. Mayor and Mr. Deputy Mayor,
As you know, a community doctor will soon be installed at the community clinic of Stavrodromi, from where he will come periodically during the month to our village. The Volunteer Group "Friends of Drosia" prepares to the extent required to operate our Community Clinic flawlessly. After the telephone communication we had with the Director of the Health Center of Erymantheia, he told us that a Telephone Line is mandatorily needed, in order to issue the Electronic Prescriptions of Medicines for those in need of Medical Care – Residents of the village. Furthermore, the exit and the last climb – staircase of the Community Infirmary, lacks a simple protective railing, to avoid an accident, taking into account the visitors of the Clinic are many and at an advanced age.
We are also preparing a big event at the picturesque Church of Ag. Athanasiou on May 1, 2018. Due to the fact that outside the Church the ground is on a downhill slope, a protective railing is also needed there, to avoid an accident especially for young children who will frequent and play in the area designated there by the Volunteer Team. Following the above, we request:
A) Immediate installation of a Telephone Line at the Community Clinic.
B) Installation of a protective railing on the last staircase towards the ascent of the Clinic and outside it.
C) Installation of a railing, outside the entrance, at the Chapel of Ag. Athanasiou of our village.
Mr. Mayor and Mr. Deputy Mayor, Due to the fact that our cooperation must be taken for granted on issues for the upgrade, for the promotion of natural potential, for the Quality of Life of the residents who remain in our village We expect the acceptance of our Requests,
Yours sincerely,
Members of the Group of Friends for "Drosia Tritaia Patras"
Dimitrios Dimitropoulos
Vasilios Dimitropoulos
Dimitra Mylona
Leonidas Massaras (Engineer)
Georgia Nikolopoulou (Teacher)
Angeliki Bethava
Attachments: Photos of the Community Infirmary and the picturesque Church of Ag. Athanasiou, where we ask for the implementation of the above Proposals
The building of the Infirmary where the railings on the façade and next to the staircase are needed.

The picturesque church of Ag. Athanasiou where the railings on the façade are needed, where after the configuration of the courtyard with your permission and subscription, the first Cultural events will take place on May 1, 2018.

